FDA Science Board Previews Device “Critical Path” R&D Opportunity List

Peripheral vasculature imaging is poised to be an early beneficiary of FDA's "critical path" initiative, CDRH Office of Science & Engineering Director Larry Kessler told the agency's Science Board April 22

Read the full article – start your free trial today!

Join thousands of industry professionals who rely on Medtech Insight for daily insights

  • Start your 7-day free trial
  • Explore trusted news, analysis, and insights
  • Access comprehensive global coverage
  • Enjoy instant access – no credit card required

More from Archive

Final Chance To Have Your Say: Take Our Reader Survey This Week

 
• By 

Editor’s note: This is your final call to participate in the survey to better understand our subscribers’ content and delivery needs. The deadline is 20 September.

Shape Our Content: Take The Reader Survey

 
• By 

Editor’s note: We are conducting a survey to better understand our subscribers’ content and delivery needs. If there are any changes you’d like to see in coverage topics, content format or the method in which you receive and access Medtech Insight, or if you love it how it is, now is the time to have your voice heard.

Patients With Movement Disorders Will Benefit From Medtronic’s Expanded MRI Labeling For DBS

 
• By 

Medtronic announced it received expanded MRI labeling for its DBS systems, which is critical, given that almost 70% of all DBS-eligible patients will likely need an MRI at some point in their care, says Ashwini Sharan, CMO for Medtronic Neuromodulation.

Podcast: Lung Life AI CEO Shares Regulatory And Reimbursement Journey For Lung Cancer Diagnostic

 

In this episode, Medtech Insight reporter Natasha Barrow speaks to LungLife AI CEO Paul Pagano. Lung Life AI is a US-based AIM-listed medical technology company that has developed a liquid biopsy test for the early detection of lung cancer called Lung LB. Pagano runs through the highlights of Lung Life AI journey to date and its future ambition for a strategic partnership. He also provides advice to similar diagnostic companies seeking reimbursement andcompliance with the US FDA Lab Developed Test ruling.

More from Medtech Insight

US FDA Unveils Plans To Consolidate Support Services

 

Commissioner Martin Makary told staff that plans are being developed to centralize HR, IT, travel and other functions, which were heavily impacted by the 1 April reduction-in-force.

A Year After Exiting The Ventilator Market, Medtronic Recalls Thousands Of Newport Devices

 

After two serious injuries and one death linked to some of its ventilators, Medtronic has recalled the devices and asked customers to stop using them and find alternative means. The action comes more than a year after the company left the market.

‘UK Must Put Adoption On A Par With Innovation’

 
• By 

Market access concerns dominated at the annual BioWales In London event, where AstraZeneca set out industry’s priorities and the UK Office for Life Sciences struck an optimistic tone about how the UK will lastingly improve uptake of innovation.